Discover Our Work

Case Studies

Proven Performance in the Field

Exposing live BP fuel supply pipeline at Perth Airport

Excavating under live pipeline at mine site

Excavating within ATOM Fuel Terminal

Safe excavation around existing services within congested site

Rail works & installation of noise wall

Environmental spill cleanup

Excavating inside shoring box to prevent undermining of main road and minimising excavation footprint

Safely working around electrical transformers

Lowering cables adjacent to rail track

Excavating in residential area for installation of pressure main

Exposing tree roots in preparation of pipeline installation

Get in Touch
Member of
Acknowledgement of Country

MTS respectfully acknowledges the Traditional Custodians of the lands on which we live, travel and operate throughout Australia.

We acknowledge their enduring connection to the lands, waterways and communities and pay our respect to Elders past, present and emerging.

Excavation Made Simple.
Effortless | Economic | Eco-Friendly
©2026. MTS Mobile Tiefbau Saugsysteme Australia Pty Ltd. All rights reserved. Site by Word 2 Mouse.